IAC Assessment: WV0617
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0617
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2021
Principal Product Metal Stamped Parts
NAICS 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469 - Metal Stampings, Nec
Sales $5,000,000-$10,000,000
# of Employees 54
Plant Area (Sq.Ft.) 65,079
Annual Production 28,000,000 Pieces
Production Hrs. Annual 3,120
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,567 1,396,438 kWh $0.07
Electricity Demand $72,460 6,868 kW-months/year $10.55
TOTAL ENERGY COSTS $175,027
RECOMMENDED SAVINGS* $24,360 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,898
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$10,582
Cost:
$19,059
$6,816 92,857 $3,766 357 - - - - $6,816
92,857
kWh
$3,766
357
kW-months/year
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,162
Cost:
$5,562
$3,326 45,317 $1,836 174 - - - - $3,326
45,317
kWh
$1,836
174
kW-months/year
-
-
$
-
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,975
Cost:
$13,590
$2,099 28,590 $876 83 - - - - $2,099
28,590
kWh
$876
83
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,562
Cost:
$209
$1,003 13,667 $559 53 - - - - $1,003
13,667
kWh
$559
53
kW-months/year
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$973
Cost:
$655
$625 8,515 $348 33 - - - - $625
8,515
kWh
$348
33
kW-months/year
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$811
Cost:
$2,732
- - - - $811 - - - -
-
kWh
-
-
kW-months/year
$811
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$743
Cost:
$2,460
$480 6,539 $263 25 - - - - $480
6,539
kWh
$263
25
kW-months/year
-
-
$
-
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$648
Cost:
$2,086
$515 7,021 $285 27 - - $(-152) - $515
7,021
kWh
$285
27
kW-months/year
-
-
$
$(-152)
-
$
09: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$454
Cost:
$1,000
$1,099 14,977 $612 58 - - $(-1,257) - $1,099
14,977
kWh
$612
58
kW-months/year
-
-
$
$(-1,257)
-
$
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$450
Cost:
$638
$292 3,972 $158 15 - - - - $292
3,972
kWh
$158
15
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$24,360
Cost:
$47,991
$16,255 221,455 $8,703 825 $811 - $(-1,409) - $16,255
221,455
kWh
$8,703
825
kW-months/year
$811
-
$
$(-1,409)
-
$
TOTAL IMPLEMENTED Savings:
$4,898
Cost:
$7,320
$3,534 48,152 $1,962 186 $811 - $(-1,409) - $3,534
48,152
kWh
$1,962
186
kW-months/year
$811
-
$
$(-1,409)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes