IAC Assessment: WV0664
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2024
Principal Product Plastic
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 257,000
Annual Production 30,000 Tons
Production Hrs. Annual 4,160
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $109,391 1,388,672 kWh $0.08
Electricity Demand $40,226 3,813 kW-months/year $10.55
Natural Gas $131,643 13,036 MMBtu $10.10
LPG $40,537 1,569 MMBtu $25.84
Fuel Oil #1 $16,463 570 MMBtu $28.88
TOTAL ENERGY COSTS $338,260
RECOMMENDED SAVINGS* $15,333 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,899
Cost:
$1,019
- - - - $3,899 386 - - -
-
kWh
-
-
kW-months/year
$3,899
386
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,056
Cost:
$426
$2,201 27,930 $855 81 - - - - $2,201
27,930
kWh
$855
81
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,777
Cost:
$3,541
$2,017 25,597 $760 72 - - - - $2,017
25,597
kWh
$760
72
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,469
Cost:
$12,134
$1,583 20,087 $886 84 - - - - $1,583
20,087
kWh
$886
84
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$911
Cost:
$1,030
$658 8,352 $253 24 - - - - $658
8,352
kWh
$253
24
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$792
Cost:
$1,500
$1,431 18,160 - - - - $(-639) - $1,431
18,160
kWh
-
-
kW-months/year
-
-
MMBtu
$(-639)
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$535
Cost:
$1,139
$577 7,316 $222 21 - - $(-264) - $577
7,316
kWh
$222
21
kW-months/year
-
-
MMBtu
$(-264)
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$391
Cost:
$222
$285 3,618 $106 10 - - - - $285
3,618
kWh
$106
10
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$382
Cost:
$328
$276 3,497 $106 10 - - - - $276
3,497
kWh
$106
10
kW-months/year
-
-
MMBtu
-
-
$
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$121
Cost:
$293
- - - - $121 12 - - -
-
kWh
-
-
kW-months/year
$121
12
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$15,333
Cost:
$21,632
$9,028 114,557 $3,188 302 $4,020 398 $(-903) - $9,028
114,557
kWh
$3,188
302
kW-months/year
$4,020
398
MMBtu
$(-903)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes