IAC logo
IAC Assessment: WV0665
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0665
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2024
Principal Product Cabinet doors, frames, door fronts
NAICS 337110 - Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434 - Wood Kitchen Cabinets
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 240,000
Annual Production 1,800,000 Units
Production Hrs. Annual 3,840
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,149,572 13,955,120 kWh $0.08
Natural Gas $239,985 35,137 MMBtu $6.83
TOTAL ENERGY COSTS $1,389,557
RECOMMENDED SAVINGS* $202,078 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$100,715
Cost:
$390,000
$100,715 1,222,272 - - - - $100,715
1,222,272
kWh
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$61,926
Cost:
$238,677
$61,926 751,524 - - - - $61,926
751,524
kWh
-
-
MMBtu
-
-
$
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,375
Cost:
$13,475
$7,375 89,497 - - - - $7,375
89,497
kWh
-
-
MMBtu
-
-
$
04: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$7,315
Cost:
$22,800
- - $7,315 1,071 - - -
-
kWh
$7,315
1,071
MMBtu
-
-
$
05: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$6,272
Cost:
$1,500
$7,189 87,245 - - $(-917) - $7,189
87,245
kWh
-
-
MMBtu
$(-917)
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,064
Cost:
$3,296
$5,064 61,451 - - - - $5,064
61,451
kWh
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,763
Cost:
$2,971
- - $3,763 551 - - -
-
kWh
$3,763
551
MMBtu
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,306
Cost:
$1,070
- - $2,306 338 - - -
-
kWh
$2,306
338
MMBtu
-
-
$
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,096
Cost:
$1,417
$2,696 32,717 - - $(-600) - $2,696
32,717
kWh
-
-
MMBtu
$(-600)
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,835
Cost:
$150
$1,835 22,273 - - - - $1,835
22,273
kWh
-
-
MMBtu
-
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,829
Cost:
$9,140
$1,344 16,305 $485 71 - - $1,344
16,305
kWh
$485
71
MMBtu
-
-
$
12: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,582
Cost:
$375
$1,582 19,193 - - - - $1,582
19,193
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$202,078
Cost:
$684,871
$189,726 2,302,477 $13,869 2,031 $(-1,517) - $189,726
2,302,477
kWh
$13,869
2,031
MMBtu
$(-1,517)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes