IAC Assessment: WV0683
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2025
Principal Product Scissor Lift and Aerial Lifts
NAICS 333923 - Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
SIC 3531 - Construction Machinery
Sales $50,000,000-$100,000,000
# of Employees 522
Plant Area (Sq.Ft.) 345,000
Annual Production 5,000 Units
Production Hrs. Annual 6,000
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $212,235 3,251,357 kWh $0.07
Electricity Demand $40,283 6,186 kW-months/year $6.51
Electricity Fees $15,004 - $ -
Natural Gas $47,572 9,940 MMBtu $4.79
TOTAL ENERGY COSTS $315,094
RECOMMENDED SAVINGS* $12,827 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,707
Cost:
$2,420
$3,926 60,128 $781 120 - - $3,926
60,128
kWh
$781
120
kW-months/year
-
-
MMBtu
02: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$3,650
Cost:
$1,300
- - - - $3,650 762 -
-
kWh
-
-
kW-months/year
$3,650
762
MMBtu
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,332
Cost:
$985
$1,013 15,513 $319 49 - - $1,013
15,513
kWh
$319
49
kW-months/year
-
-
MMBtu
04: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$1,279
Cost:
$3,050
- - - - $1,279 267 -
-
kWh
-
-
kW-months/year
$1,279
267
MMBtu
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$947
Cost:
$500
$791 12,120 $156 24 - - $791
12,120
kWh
$156
24
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$703
Cost:
$188
$586 8,970 $117 18 - - $586
8,970
kWh
$117
18
kW-months/year
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$209
Cost:
$60
$176 2,696 $33 5 - - $176
2,696
kWh
$33
5
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$12,827
Cost:
$8,503
$6,492 99,427 $1,406 216 $4,929 1,029 $6,492
99,427
kWh
$1,406
216
kW-months/year
$4,929
1,029
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas