IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

610

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0362 # 02 Y:2005 02 2005 INSTALL OCCUPANCY SENSORS $5,310 $2,525 Not Implemented
UF0362 # 03 Y:2005 03 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,498 $0 Not Implemented
UF0362 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $767 $0 Not Implemented
UF0362 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $245 $324 Not Implemented
UF0362 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,793 $16,078 Not Implemented
UF0362 # 07 Y:2005 07 2005 ADD AREA LIGHTING SWITCHES $357 $3,655 Not Implemented
UF0362 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $288 $245 Not Implemented
UF0362 # 09 Y:2005 09 2005 INSULATE BARE EQUIPMENT $1,276 $168 Not Implemented
UF0362 # 10 Y:2005 10 2005 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $8,012 $0 Not Implemented
UF0362 # 11 Y:2005 11 2005 RECYCLE FLUORESCENT LAMPS $355 $3,496 Not Implemented
MI0101 # 01 Y:2005 01 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $51,010 $72,500 Not Implemented
MI0101 # 02 Y:2005 02 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,178 $180 Implemented
MI0101 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,508 $3,000 Not Implemented
MI0101 # 04 Y:2005 04 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,336 $600 Not Implemented
MI0101 # 05 Y:2005 05 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,200 $6,660 Implemented
MI0101 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,386 $1,030 Implemented
MI0101 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $294 $195 Not Implemented
MI0099 # 01 Y:2005 01 2005 REPLACE BOILER $31,718 $82,200 Implemented
MI0099 # 02 Y:2005 02 2005 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $16,520 $7,062 Not Implemented
MI0099 # 03 Y:2005 03 2005 UPGRADE CONTROLS ON COMPRESSORS $11,973 $2,750 Implemented
MI0099 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,746 $4,736 Not Implemented
MI0099 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,897 $470 Implemented
MI0099 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,355 $1,750 Implemented
MI0099 # 07 Y:2005 07 2005 USE MINIMUM STEAM OPERATING PRESSURE $200 $115 Implemented
MI0092 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $27,250 $720 Not Implemented