IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

177

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0351 # 08 Y:2023 08 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $42,244 $83,200 n/a
MZ0351 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,603 $3,000 n/a
MZ0351 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,304 $0 n/a
MZ0351 # 07 Y:2023 07 2023 INSULATE BARE EQUIPMENT $1,019 $814 n/a
MZ0351 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,137 $23,955 n/a
MZ0351 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,533 $640 n/a
MZ0351 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $72,794 $24,018 n/a
MZ0351 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,579 $16,300 n/a
MZ0347 # 06 Y:2023 06 2023 REPAIR AND ELIMINATE STEAM LEAKS $1,668 $380 Implemented
MZ0347 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $3,495 $1,500 Not Implemented
MZ0347 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,827 $220 Not Implemented
MZ0347 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,683 $0 Implemented
MZ0347 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,018 $1,320 Not Implemented
MZ0347 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $91,034 $35,384 Implemented
MZ0347 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,124 $22,000 Not Implemented
MZ0338 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $576,991 $4,487,250 Not Implemented
MZ0338 # 02 Y:2023 02 2023 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,823 $860 Implemented
MZ0338 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $2,124 $3,920 Implemented
MZ0338 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $60,112 $127,747 Implemented
MZ0338 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,644 $13,800 Implemented
MZ0338 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,195 $240 Not Implemented
MZ0333 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,752 $66 n/a
MZ0333 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,379 $21,815 n/a
MZ0333 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,542 $3,330 n/a
MZ0333 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $2,733 $1,330 n/a