IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 3113 Sugar and Confectionery Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0235 # 02 Y:2024 02 2024 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $271,861 $3,050,000 n/a
UU0235 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $12,478 $23,282 n/a
UU0235 # 04 Y:2024 04 2024 USE OPTIMUM THICKNESS INSULATION $6,968 $8,826 n/a
UU0235 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,664 $1,013 n/a
UU0224 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,006 $51 Implemented
UU0224 # 02 Y:2023 02 2023 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,206 $7,560 Implemented
UU0224 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,006 $10,650 Implemented
UU0224 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,361 $1,485 Implemented
UU0224 # 05 Y:2023 05 2023 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,224 $4,500 Not Implemented
UU0224 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,460 $1,382 Implemented
BS0019 # 10 Y:2013 10 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $142 $551 Implemented
BS0019 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $165 $120 Implemented
BS0019 # 08 Y:2013 08 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $310 $25 Not Implemented
BS0019 # 07 Y:2013 07 2013 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $23 $25 Implemented
BS0019 # 06 Y:2013 06 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $197 $349 Implemented
BS0019 # 05 Y:2013 05 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $47 $36 Implemented
BS0019 # 04 Y:2013 04 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $41 $81 Implemented
BS0019 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $84 $157 Not Implemented
BS0019 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $342 $349 Implemented
BS0019 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $187 $364 Not Implemented