IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 311352 Confectionery Manufacturing from Purchased Chocolate
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0005 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,218 $962 Implemented
SJ0005 # 06 Y:2023 06 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $5,992 $2,536 Implemented
SJ0005 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,251 $4,556 Not Implemented
SJ0005 # 03 Y:2023 03 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $270 $0 Not Implemented
SJ0005 # 02 Y:2023 02 2023 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $23,445 $5,613 Not Implemented
SJ0005 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $854 $658 Not Implemented
SF0551 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,014 $4,946 Not Implemented
SF0551 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $797 $1,133 Not Implemented
SF0551 # 02 Y:2020 02 2020 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $12,721 $702 Not Implemented
SF0551 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $1,322 $0 Not Implemented
SF0541 # 04 Y:2019 04 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $1,697 $1,327 Implemented
SF0541 # 11 Y:2019 11 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $49,416 $245,226 Not Implemented
SF0541 # 10 Y:2019 10 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,140 $26,538 Implemented
SF0541 # 09 Y:2019 09 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $36,428 $115,019 Implemented
SF0541 # 08 Y:2019 08 2019 INSULATE BARE EQUIPMENT $2,727 $8,304 Implemented
SF0541 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,599 $153,278 Implemented
SF0541 # 06 Y:2019 06 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $261 $578 Implemented
SF0541 # 05 Y:2019 05 2019 REPAIR AND ELIMINATE STEAM LEAKS $7,042 $7,678 Implemented
SF0541 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,931 $15,969 Implemented
SF0541 # 02 Y:2019 02 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,815 $1,514 Implemented
SF0541 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,964 $5,000 Implemented
SF0406 # 08 Y:2012 08 2012 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $25,304 $93,999 Not Implemented
SF0406 # 06 Y:2012 06 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,352 $1,460 Not Implemented
SF0406 # 05 Y:2012 05 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,567 $3,773 Implemented
SF0406 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $2,483 $0 Implemented