Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsNAICS | 311352 | Confectionery Manufacturing from Purchased Chocolate |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0005 # 06 Y:2023 | 06 | 2023 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $5,992 | $2,536 | Implemented |
SJ0005 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $854 | $658 | Not Implemented |
SJ0005 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,251 | $4,556 | Not Implemented |
SJ0005 # 03 Y:2023 | 03 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $270 | $0 | Not Implemented |
SJ0005 # 02 Y:2023 | 02 | 2023 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $23,445 | $5,613 | Not Implemented |
SJ0005 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,218 | $962 | Implemented |
SF0551 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,014 | $4,946 | Not Implemented |
SF0551 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $797 | $1,133 | Not Implemented |
SF0551 # 02 Y:2020 | 02 | 2020 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $12,721 | $702 | Not Implemented |
SF0551 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,322 | $0 | Not Implemented |
SF0541 # 06 Y:2019 | 06 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $261 | $578 | Implemented |
SF0541 # 11 Y:2019 | 11 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $49,416 | $245,226 | Not Implemented |
SF0541 # 10 Y:2019 | 10 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,140 | $26,538 | Implemented |
SF0541 # 09 Y:2019 | 09 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $36,428 | $115,019 | Implemented |
SF0541 # 08 Y:2019 | 08 | 2019 | INSULATE BARE EQUIPMENT | $2,727 | $8,304 | Implemented |
SF0541 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,599 | $153,278 | Implemented |
SF0541 # 05 Y:2019 | 05 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $7,042 | $7,678 | Implemented |
SF0541 # 04 Y:2019 | 04 | 2019 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $1,697 | $1,327 | Implemented |
SF0541 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,931 | $15,969 | Implemented |
SF0541 # 02 Y:2019 | 02 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,815 | $1,514 | Implemented |
SF0541 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,964 | $5,000 | Implemented |
SF0406 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,385 | $0 | Implemented |
SF0406 # 10 Y:2012 | 10 | 2012 | INSTALL OCCUPANCY SENSORS | $4,954 | $21,408 | Not Implemented |
SF0406 # 09 Y:2012 | 09 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,696 | $10,439 | Not Implemented |
SF0406 # 08 Y:2012 | 08 | 2012 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $25,304 | $93,999 | Not Implemented |