Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsNAICS | 3114 | Fruit and Vegetable Preserving and Specialty Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0037 # 05 Y:2023 | 05 | 2023 | INCREASE AMOUNT OF CONDENSATE RETURNED | $104,339 | $0 | Implemented |
MU0037 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,677 | $8,432 | Not Implemented |
MU0037 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $65,091 | $242,014 | Implemented |
MU0037 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,719 | $180 | Implemented |
MU0037 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $206,493 | $9,224 | Not Implemented |
UM0411 # 05 Y:2012 | 05 | 2012 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $15,341 | $5,000 | Not Implemented |
UM0411 # 04 Y:2012 | 04 | 2012 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $56,000 | $225,000 | Not Implemented |
UM0411 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $821 | $100 | Implemented |
UM0411 # 01 Y:2012 | 01 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,396 | $2,000 | Not Implemented |
UM0411 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,402 | $200 | Not Implemented |
UM0394 # 02 Y:2011 | 02 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $6,227 | $12,120 | Not Implemented |
UM0394 # 09 Y:2011 | 09 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,902 | $10,000 | Not Implemented |
UM0394 # 08 Y:2011 | 08 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $180 | $10 | Not Implemented |
UM0394 # 07 Y:2011 | 07 | 2011 | INSTALL OCCUPANCY SENSORS | $1,389 | $1,350 | Not Implemented |
UM0394 # 06 Y:2011 | 06 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,811 | $5,000 | Not Implemented |
UM0394 # 05 Y:2011 | 05 | 2011 | INSULATE BARE EQUIPMENT | $1,971 | $2,584 | Implemented |
UM0394 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,147 | $200 | Implemented |
UM0394 # 03 Y:2011 | 03 | 2011 | OPTIMIZE PLANT POWER FACTOR | $4,589 | $3,850 | Not Implemented |
UM0394 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,893 | $37,992 | Not Implemented |
UM0318 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,540 | $14,000 | Implemented |
UM0318 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,573 | $7,025 | Not Implemented |
UM0318 # 03 Y:2007 | 03 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,279 | $0 | Implemented |
UM0318 # 04 Y:2007 | 04 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,947 | $4,500 | Implemented |
UM0318 # 05 Y:2007 | 05 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,647 | $120 | Implemented |
UM0318 # 06 Y:2007 | 06 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,516 | $1,650 | Not Implemented |