IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 311421 Fruit and Vegetable Canning
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0733 # 02 Y:2017 02 2017 METER WASTE WATER $16,425 $3,000 Implemented
AM0733 # 03 Y:2017 03 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $32,880 $15,000 Implemented
AM0733 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,370 $10 Implemented
AM0733 # 05 Y:2017 05 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,040 $0 Implemented
AM0733 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $260 $271 Implemented
AM0733 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,290 $1,720 Implemented
AM0733 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,560 $2,000 Implemented
LE0433 # 15 Y:2017 15 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,312 $10,220 Not Implemented
LE0433 # 14 Y:2017 14 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $337 $1,488 Not Implemented
LE0433 # 13 Y:2017 13 2017 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $53,347 $200,000 Not Implemented
LE0433 # 12 Y:2017 12 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,262 $8,160 Not Implemented
LE0433 # 11 Y:2017 11 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,503 $54,000 Not Implemented
LE0433 # 10 Y:2017 10 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,899 $58,000 Not Implemented
LE0433 # 09 Y:2017 09 2017 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $9,040 $22,500 Not Implemented
LE0433 # 08 Y:2017 08 2017 REPLACE BOILER $397,300 $900,000 Not Implemented
LE0433 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,926 $75,373 Not Implemented
LE0433 # 06 Y:2017 06 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $35,515 $53,000 Not Implemented
LE0433 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,653 $31,212 Not Implemented
LE0433 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,684 $4,000 Not Implemented
LE0433 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $724 $300 Not Implemented
LE0433 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,615 $1,000 Not Implemented
LE0433 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $1,292 $44 Not Implemented