Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
101
matching recommendationsNAICS | 3115 | Dairy Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0365 # 12 Y:2019 | 12 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,967 | $384 | Not Implemented |
MI0365 # 05 Y:2019 | 05 | 2019 | OPTIMIZE PLANT POWER FACTOR | $11,189 | $36,745 | Not Implemented |
MI0365 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,108 | $11,078 | Not Implemented |
MI0365 # 07 Y:2019 | 07 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $10,416 | $10,416 | Not Implemented |
MI0365 # 06 Y:2019 | 06 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,965 | $6,898 | Not Implemented |
MI0365 # 14 Y:2019 | 14 | 2019 | USE PHOTOCELL CONTROLS | $1,552 | $216 | Not Implemented |
MI0365 # 15 Y:2019 | 15 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $141 | $245 | Not Implemented |
MI0365 # 09 Y:2019 | 09 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,981 | $6,228 | Not Implemented |
MI0365 # 02 Y:2019 | 02 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $22,459 | $2,300 | Not Implemented |
MI0365 # 10 Y:2019 | 10 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,083 | $960 | Not Implemented |
MI0365 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,931 | $12,640 | Not Implemented |
MI0365 # 01 Y:2019 | 01 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $434,947 | $1,742,938 | Not Implemented |
MI0365 # 04 Y:2019 | 04 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,590 | $13,390 | Not Implemented |
MI0365 # 13 Y:2019 | 13 | 2019 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $3,252 | $13,180 | Not Implemented |
MI0365 # 11 Y:2019 | 11 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,193 | $1,980 | Not Implemented |
BS0132 # 03 Y:2019 | 03 | 2019 | OPERATE BOILERS ON HIGH FIRE SETTING | $51,880 | $0 | Not Implemented |
BS0132 # 10 Y:2019 | 10 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $682 | $1,005 | Not Implemented |
BS0132 # 09 Y:2019 | 09 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,840 | $16,194 | Not Implemented |
BS0132 # 08 Y:2019 | 08 | 2019 | AVOID FROST FORMATION ON EVAPORATORS | $3,938 | $2,781 | Not Implemented |
BS0132 # 07 Y:2019 | 07 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $6,466 | $6,828 | Not Implemented |
BS0132 # 06 Y:2019 | 06 | 2019 | INSTALL OCCUPANCY SENSORS | $5,715 | $8,435 | Not Implemented |
BS0132 # 05 Y:2019 | 05 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,164 | $15,537 | Not Implemented |
BS0132 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $11,835 | $21,198 | Not Implemented |
BS0132 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,999 | $680 | Not Implemented |
BS0132 # 01 Y:2019 | 01 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $21,247 | $10,080 | Not Implemented |