IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

191

matching recommendations
Reset
NAICS 31151 Dairy Product (except Frozen) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0459 # 12 Y:2015 12 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $58,197 $81,522 Implemented
SF0459 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,158 $24,030 Implemented
SF0459 # 14 Y:2015 14 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $42,975 $82,916 Implemented
SF0459 # 15 Y:2015 15 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,707 $39,862 Not Implemented
SF0459 # 16 Y:2015 16 2015 INSTALL OCCUPANCY SENSORS $6,651 $23,688 Not Implemented
SF0459 # 17 Y:2015 17 2015 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $166,472 $100,519 Implemented
SF0459 # 18 Y:2015 18 2015 USE POWER DURING OFF-PEAK PERIODS $5,106 $0 Not Implemented
SF0419 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $637 $80 Implemented
SF0419 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,754 $2,287 Not Implemented
SF0419 # 03 Y:2012 03 2012 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $1,176 $963 Not Implemented
SF0419 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,431 $16,162 Implemented
SF0419 # 05 Y:2012 05 2012 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $8,615 $42,287 Not Implemented
SF0419 # 06 Y:2012 06 2012 HEAT WATER WITH EXHAUST HEAT $5,628 $35,328 Not Implemented
SD0455 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,382 $200 Not Implemented
SD0455 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,441 $5,300 Not Implemented
SD0455 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,465 $2,530 Not Implemented
SD0455 # 04 Y:2012 04 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $706 $252 Not Implemented
SD0455 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,808 $1,295 Not Implemented
SD0455 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $5,541 $4,213 Not Implemented
SD0455 # 07 Y:2012 07 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,146 $3,112 Not Implemented
SD0455 # 08 Y:2012 08 2012 INSULATE FEEDWATER TANK $2,266 $2,574 Not Implemented
SD0455 # 09 Y:2012 09 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,156 $7,124 Not Implemented
SD0455 # 10 Y:2012 10 2012 USE PHOTOCELL CONTROLS $1,606 $2,550 Not Implemented
SF0407 # 01 Y:2012 01 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $44,715 $0 Not Implemented
SF0407 # 02 Y:2012 02 2012 REPAIR AND ELIMINATE STEAM LEAKS $7,965 $672 Implemented