IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
NAICS 31151 Dairy Product (except Frozen) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0132 # 07 Y:2019 07 2019 REPAIR OR REPLACE STEAM TRAPS $6,466 $6,828 Not Implemented
BS0132 # 06 Y:2019 06 2019 INSTALL OCCUPANCY SENSORS $5,715 $8,435 Not Implemented
BS0132 # 08 Y:2019 08 2019 AVOID FROST FORMATION ON EVAPORATORS $3,938 $2,781 Not Implemented
BS0132 # 05 Y:2019 05 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,164 $15,537 Not Implemented
BS0132 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $11,835 $21,198 Not Implemented
BS0132 # 10 Y:2019 10 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $682 $1,005 Not Implemented
BS0132 # 11 Y:2019 11 2019 UPGRADE CONTROLS ON COMPRESSORS $14,577 $12,760 Not Implemented
BS0132 # 09 Y:2019 09 2019 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,840 $16,194 Not Implemented
BS0132 # 03 Y:2019 03 2019 OPERATE BOILERS ON HIGH FIRE SETTING $51,880 $0 Not Implemented
BS0132 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,999 $680 Not Implemented
BS0132 # 01 Y:2019 01 2019 UPGRADE CONTROLS ON COMPRESSORS $21,247 $10,080 Not Implemented
BS0125 # 02 Y:2019 02 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $143 $260 Not Implemented
BS0125 # 05 Y:2019 05 2019 REPAIR OR REPLACE STEAM TRAPS $7,006 $5,147 Not Implemented
BS0125 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,903 $4,567 Not Implemented
BS0125 # 11 Y:2019 11 2019 AVOID FROST FORMATION ON EVAPORATORS $2,258 $618 Not Implemented
BS0125 # 10 Y:2019 10 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,813 $5,325 Not Implemented
BS0125 # 09 Y:2019 09 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,644 $3,670 Not Implemented
BS0125 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $691 $615 Not Implemented
BS0125 # 07 Y:2019 07 2019 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $12,064 $54,000 Not Implemented
BS0125 # 06 Y:2019 06 2019 UPGRADE OBSOLETE EQUIPMENT $4,616 $8,000 Not Implemented
BS0125 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $2,168 $10,162 Not Implemented
BS0125 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $320 $50 Not Implemented
BS0070 # 08 Y:2016 08 2016 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $9,918 $88,300 Not Implemented
BS0070 # 01 Y:2016 01 2016 REPAIR OR REPLACE STEAM TRAPS $13,590 $12,584 Implemented
BS0070 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,026 $744 Implemented