IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

241

matching recommendations
Reset
NAICS 311514 Dry, Condensed, and Evaporated Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0459 # 18 Y:2015 18 2015 USE POWER DURING OFF-PEAK PERIODS $5,106 $0 Not Implemented
IA0516 # 01 Y:2014 01 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,115 $10,277 Implemented
IA0516 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,099 $100 Not Implemented
IA0516 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,528 $2,790 Implemented
IA0516 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,151 $2,005 Implemented
IA0516 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,297 $376 Implemented
IA0516 # 06 Y:2014 06 2014 USE PHOTOCELL CONTROLS $307 $1,035 Not Implemented
IA0516 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $1,138 $1,530 Not Implemented
BS0028 # 01 Y:2014 01 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,764 $1,960 Implemented
BS0028 # 02 Y:2014 02 2014 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,219 $7,950 Implemented
BS0028 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,895 $15,396 Implemented
BS0028 # 04 Y:2014 04 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,837 $449 Implemented
BS0028 # 05 Y:2014 05 2014 REPAIR OR REPLACE STEAM TRAPS $60,962 $13,425 Implemented
BS0028 # 06 Y:2014 06 2014 DIRECT WARMEST AIR TO COMBUSTION INTAKE $6,297 $380 Not Implemented
BS0028 # 07 Y:2014 07 2014 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,854 $4,175 Not Implemented
BS0028 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,203 $15,635 Implemented
MZ0112 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,576 $14,260 Implemented
MZ0112 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $6,417 $3,000 Implemented
MZ0112 # 03 Y:2013 03 2013 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $4,329 $0 Not Implemented
MZ0112 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,415 $0 Implemented
MZ0112 # 05 Y:2013 05 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $48,000 $2,270 Implemented
MZ0112 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,024 $1,150 Not Implemented
MZ0112 # 07 Y:2013 07 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,737 $0 Not Implemented
MZ0112 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,303 $1,160 Not Implemented
MZ0112 # 09 Y:2013 09 2013 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $61,800 $450,000 Not Implemented