Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsNAICS | 311514 | Dry, Condensed, and Evaporated Dairy Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0459 # 10 Y:2015 | 10 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,935 | $5,491 | Not Implemented |
SF0459 # 18 Y:2015 | 18 | 2015 | USE POWER DURING OFF-PEAK PERIODS | $5,106 | $0 | Not Implemented |
SF0459 # 17 Y:2015 | 17 | 2015 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $166,472 | $100,519 | Implemented |
SF0459 # 16 Y:2015 | 16 | 2015 | INSTALL OCCUPANCY SENSORS | $6,651 | $23,688 | Not Implemented |
SF0459 # 15 Y:2015 | 15 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,707 | $39,862 | Not Implemented |
SF0459 # 14 Y:2015 | 14 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $42,975 | $82,916 | Implemented |
SF0459 # 13 Y:2015 | 13 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,158 | $24,030 | Implemented |
SF0459 # 12 Y:2015 | 12 | 2015 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $58,197 | $81,522 | Implemented |
SF0459 # 11 Y:2015 | 11 | 2015 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $17,754 | $22,786 | Implemented |
SF0459 # 01 Y:2015 | 01 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $29,918 | $5,047 | Implemented |
SF0459 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,959 | $6,271 | Not Implemented |
SF0459 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,977 | $11,607 | Not Implemented |
SF0459 # 07 Y:2015 | 07 | 2015 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,292 | $1,945 | Implemented |
SF0459 # 06 Y:2015 | 06 | 2015 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $23,360 | $14,429 | Implemented |
SF0459 # 05 Y:2015 | 05 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,624 | $15,013 | Not Implemented |
SF0459 # 04 Y:2015 | 04 | 2015 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $41,206 | $19,989 | Not Implemented |
SF0459 # 03 Y:2015 | 03 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $196,316 | $40,788 | Not Implemented |
SF0459 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $391 | $0 | Implemented |