Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
71
matching recommendationsNAICS | 31161 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0086 # 01 Y:2023 | 01 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $48,136 | $100,000 | Not Implemented |
NL0086 # 05 Y:2023 | 05 | 2023 | KEEP EQUIPMENT CLEAN | $350 | $450 | Not Implemented |
NL0086 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $573 | $510 | Not Implemented |
NL0086 # 03 Y:2023 | 03 | 2023 | METER WASTE WATER | $4,239 | $1,348 | Implemented |
NL0086 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $6,202 | $6,211 | Implemented |
NL0075 # 05 Y:2022 | 05 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $635 | $575 | Not Implemented |
NL0075 # 04 Y:2022 | 04 | 2022 | INSULATE BARE EQUIPMENT | $980 | $404 | Implemented |
NL0075 # 01 Y:2022 | 01 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $13,412 | $7,500 | Implemented |
NL0075 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,755 | $28,900 | Not Implemented |
NL0075 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,087 | $1,652 | Implemented |
NL0071 # 01 Y:2022 | 01 | 2022 | REPLACE BOILER | $280,847 | $220,000 | Not Implemented |
NL0071 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,879 | $30,410 | Implemented |
NL0071 # 04 Y:2022 | 04 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,139 | $8,000 | Not Implemented |
NL0071 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,447 | $4,500 | Implemented |
NL0071 # 07 Y:2022 | 07 | 2022 | INSULATE BARE EQUIPMENT | $407 | $2,521 | Implemented |
NL0071 # 05 Y:2022 | 05 | 2022 | INSULATE BARE EQUIPMENT | $2,400 | $9,724 | Implemented |
NL0071 # 02 Y:2022 | 02 | 2022 | MINIMIZE WATER USAGE | $106,955 | $72,150 | Implemented |
NL0047 # 01 Y:2020 | 01 | 2020 | MINIMIZE WATER USAGE | $75,018 | $1,383 | Not Implemented |
NL0047 # 02 Y:2020 | 02 | 2020 | METER WASTE WATER | $41,210 | $15,000 | Implemented |
NL0047 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,600 | $6,024 | Implemented |
NL0047 # 04 Y:2020 | 04 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,234 | $230 | Implemented |
NL0047 # 05 Y:2020 | 05 | 2020 | RECOVER AND REUSE WASTE MATERIAL | $925 | $5,160 | Not Implemented |
NL0047 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $643 | $1,700 | Implemented |
NL0047 # 07 Y:2020 | 07 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $301 | $1,148 | Implemented |
NL0039 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $36,367 | $39,000 | Implemented |