Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,427
matching recommendationsNAICS | 31161 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0965 # 09 Y:2017 | 09 | 2017 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $5,101 | $0 | Implemented |
UD0965 # 10 Y:2017 | 10 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $41,935 | $20,000 | Implemented |
UD0965 # 11 Y:2017 | 11 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $560 | $300 | Implemented |
UD0965 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,081 | $1,230 | Implemented |
SD0539 # 01 Y:2017 | 01 | 2017 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $289,101 | $1,166,652 | Not Implemented |
SD0539 # 02 Y:2017 | 02 | 2017 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $8,037 | $28,000 | Not Implemented |
SD0539 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,649 | $9,540 | Implemented |
SD0539 # 04 Y:2017 | 04 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,984 | $18,111 | Implemented |
SD0539 # 05 Y:2017 | 05 | 2017 | REPAIR AND ELIMINATE STEAM LEAKS | $4,167 | $600 | Implemented |
SD0539 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,327 | $1,500 | Implemented |
SD0539 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $496 | $1,765 | Not Implemented |
SD0539 # 08 Y:2017 | 08 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $276 | $800 | Not Implemented |
UM0476 # 01 Y:2017 | 01 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,342 | $9,000 | n/a |
UM0476 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,110 | $16,000 | n/a |
UM0476 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $1,056 | $2,500 | n/a |
UM0476 # 04 Y:2017 | 04 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,512 | $8,125 | n/a |
UM0476 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,157 | $50,000 | n/a |
OK0951 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,548 | $62,561 | Not Implemented |
OK0951 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,244 | $12,740 | Not Implemented |
OK0951 # 03 Y:2016 | 03 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $26,114 | $42,500 | Not Implemented |
OK0951 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,904 | $3,000 | Implemented |
OK0951 # 05 Y:2016 | 05 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,675 | $2,816 | Implemented |
OK0951 # 06 Y:2016 | 06 | 2016 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,980 | $7,000 | Not Implemented |
OK0951 # 07 Y:2016 | 07 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $17,684 | $1,972 | Not Implemented |
OK0951 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,014 | $4,000 | Not Implemented |