IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

219

matching recommendations
Reset
NAICS 311613 Rendering and Meat Byproduct Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1008 # 06 Y:2019 06 2019 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $8,111 $13,455 Not Implemented
UD1008 # 07 Y:2019 07 2019 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $5,658 $0 Not Implemented
UD1008 # 08 Y:2019 08 2019 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $3,596 $0 Not Implemented
UD1008 # 10 Y:2019 10 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,896 $500 Implemented
UD1008 # 09 Y:2019 09 2019 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $28,777 $27,800 Not Implemented
MI0329 # 05 Y:2018 05 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,453 $2,520 Implemented
MI0329 # 11 Y:2018 11 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $535 $40 Implemented
MI0329 # 10 Y:2018 10 2018 INSTALL OCCUPANCY SENSORS $2,804 $1,060 Implemented
MI0329 # 09 Y:2018 09 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,990 $4,250 Not Implemented
MI0329 # 08 Y:2018 08 2018 OPTIMIZE PLANT POWER FACTOR $3,469 $12,235 Not Implemented
MI0329 # 07 Y:2018 07 2018 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,580 $460 Implemented
MI0329 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,257 $10,017 Implemented
MI0329 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,950 $1,660 Implemented
MI0329 # 03 Y:2018 03 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $7,784 $636 Not Implemented
MI0329 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,815 $1,746 Not Implemented
MI0329 # 01 Y:2018 01 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,609 $40 Implemented
SU0439 # 07 Y:2017 07 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,395 $41,742 Implemented
AM0730 # 01 Y:2017 01 2017 UPGRADE CONTROLS ON COMPRESSORS $1,220 $20 Implemented
SU0439 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $947 $0 Implemented
SU0439 # 01 Y:2017 01 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,112 $0 Implemented
AM0730 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $470 $500 Implemented
SU0439 # 03 Y:2017 03 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $38 $0 Implemented
SU0439 # 04 Y:2017 04 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $23 $0 Implemented
AM0730 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $760 $10 Not Implemented
AM0730 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $890 $2,140 Implemented