Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsNAICS | 3118 | Bakeries and Tortilla Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0172 # 02 Y:2023 | 02 | 2023 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $512 | $83 | Not Implemented |
IP0172 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,640 | $132 | Not Implemented |
IP0172 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,584 | $8,088 | Not Implemented |
IP0172 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,315 | $14,588 | Not Implemented |
IP0172 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,870 | $1,313 | Not Implemented |
IP0133 # 05 Y:2020 | 05 | 2020 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,196 | $4,991 | Not Implemented |
IP0133 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $618 | $553 | Not Implemented |
IP0133 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,033 | $14,189 | Not Implemented |
IP0133 # 02 Y:2020 | 02 | 2020 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $2,073 | $1,218 | Not Implemented |
IP0133 # 01 Y:2020 | 01 | 2020 | INSTALL OCCUPANCY SENSORS | $1,574 | $343 | Not Implemented |
IP0048 # 05 Y:2015 | 05 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,880 | $430 | Implemented |
IP0048 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $116 | $413 | Implemented |
IP0048 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,176 | $8,753 | Implemented |
IP0048 # 08 Y:2015 | 08 | 2015 | APPLY FOR INVESTMENT INCENTIVES | $15,491 | $9,000 | Not Implemented |
IP0048 # 07 Y:2015 | 07 | 2015 | APPLY FOR INVESTMENT INCENTIVES | $8,854 | $4,500 | Not Implemented |
IP0048 # 06 Y:2015 | 06 | 2015 | AIR CONDITION ONLY SPACE NECESSARY | $394 | $193 | Not Implemented |
IP0048 # 04 Y:2015 | 04 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $902 | $45 | Implemented |
IP0048 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,718 | $5 | Implemented |
IP0048 # 02 Y:2015 | 02 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,379 | $5 | Implemented |
IP0048 # 01 Y:2015 | 01 | 2015 | COMBINE UTILITY METERS | $27,805 | $21 | Not Implemented |
IP0047 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,458 | $163 | Implemented |
IP0047 # 06 Y:2015 | 06 | 2015 | APPLY FOR INVESTMENT INCENTIVES | $10,288 | $5,000 | Implemented |
IP0047 # 05 Y:2015 | 05 | 2015 | APPLY FOR INVESTMENT INCENTIVES | $30,801 | $10,000 | Implemented |
IP0047 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,968 | $623 | Not Implemented |
IP0047 # 03 Y:2015 | 03 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,543 | $900 | Not Implemented |