Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,202
matching recommendationsNAICS | 31181 | Bread and Bakery Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0581 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,579 | $1,648 | n/a |
SU0581 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,336 | $0 | n/a |
SU0581 # 02 Y:2025 | 02 | 2025 | DISCONNECT BALLASTS | $331 | $0 | n/a |
SU0581 # 07 Y:2025 | 07 | 2025 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,877 | $1,220 | n/a |
SU0581 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $697 | $38 | n/a |
SU0581 # 01 Y:2025 | 01 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $990 | $0 | n/a |
SU0581 # 10 Y:2025 | 10 | 2025 | INSTALL OCCUPANCY SENSORS | $123 | $769 | n/a |
SU0581 # 09 Y:2025 | 09 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,318 | $15,784 | n/a |
SU0581 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $149 | $172 | n/a |
SU0581 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,466 | $0 | n/a |
UC2417 # 01 Y:2024 | 01 | 2024 | PAY UTILITY BILLS ON TIME | $888 | $0 | n/a |
UC2417 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,329 | $0 | n/a |
UC2417 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,301 | $75 | n/a |
UC2417 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $2,644 | $9,173 | n/a |
UC2417 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $5,554 | $1,050 | n/a |
UC2417 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,989 | $7,146 | n/a |
TT0310 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,799 | $60 | n/a |
TT0310 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $6,590 | $2,200 | n/a |
TT0310 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,068 | $12,500 | n/a |
TT0310 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $25,939 | $3,600 | n/a |
TT0310 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,227 | $9,500 | n/a |
TT0310 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $335 | $75 | n/a |
TT0310 # 02 Y:2024 | 02 | 2024 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,414 | $17,000 | n/a |
SF0612 # 05 Y:2024 | 05 | 2024 | USE OPTIMUM THICKNESS INSULATION | $106 | $151 | Not Implemented |
SF0612 # 06 Y:2024 | 06 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $21,923 | $54,880 | Not Implemented |