Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsNAICS | 311812 | Commercial Bakeries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0359 # 08 Y:2011 | 08 | 2011 | INSTALL OCCUPANCY SENSORS | $59 | $240 | Implemented |
LL0359 # 07 Y:2011 | 07 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $421 | $220 | Not Implemented |
LL0359 # 06 Y:2011 | 06 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $514 | $623 | Not Implemented |
LL0359 # 05 Y:2011 | 05 | 2011 | INSULATE BARE EQUIPMENT | $515 | $394 | Not Implemented |
LL0359 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $602 | $385 | Implemented |
LL0359 # 01 Y:2011 | 01 | 2011 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $24,918 | $64,500 | Not Implemented |
LL0359 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,575 | $400 | Implemented |
LL0359 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $639 | $3,115 | Implemented |
BD0396 # 02 Y:2011 | 02 | 2011 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $26,133 | $39,000 | Not Implemented |
BD0396 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $72,574 | $19,000 | Not Implemented |
BD0396 # 07 Y:2011 | 07 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,851 | $600 | Not Implemented |
BD0396 # 06 Y:2011 | 06 | 2011 | INSTALL OCCUPANCY SENSORS | $3,890 | $4,200 | Not Implemented |
BD0396 # 05 Y:2011 | 05 | 2011 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $6,576 | $300 | Not Implemented |
BD0396 # 04 Y:2011 | 04 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,736 | $20,080 | Not Implemented |
BD0396 # 03 Y:2011 | 03 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,092 | $30,000 | Not Implemented |
UM0392 # 09 Y:2011 | 09 | 2011 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $33,030 | $37,825 | Not Implemented |
UM0392 # 08 Y:2011 | 08 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $630 | $1,000 | Implemented |
UM0392 # 07 Y:2011 | 07 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $10,240 | $13,740 | Not Implemented |
UM0392 # 06 Y:2011 | 06 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $30,528 | $66,561 | Not Implemented |
UM0392 # 05 Y:2011 | 05 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $781 | $1,000 | Not Implemented |
UM0392 # 04 Y:2011 | 04 | 2011 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $1,205 | $130 | Not Implemented |
UM0392 # 03 Y:2011 | 03 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,083 | $500 | Not Implemented |
UM0392 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $9,765 | $5,250 | Implemented |
UM0392 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,168 | $54,459 | Implemented |
TT0066 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,900 | $7,100 | Not Implemented |