IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0796 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $130,526 $1,312,500 n/a
OR0796 # 02 Y:2024 02 2024 ADOPT IN-HOUSE MATERIAL GENERATION $86,946 $168,430 n/a
OR0796 # 01 Y:2024 01 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $733 $546 n/a
OR0796 # 03 Y:2024 03 2024 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $584 $2,239 n/a
BS0099 # 08 Y:2017 08 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $135 $13 Not Implemented
BS0099 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $428 $308 Not Implemented
BS0099 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $456 $7 Not Implemented
BS0099 # 05 Y:2017 05 2017 TREAT AND REUSE RINSE WATERS $773 $7,514 Not Implemented
BS0099 # 09 Y:2017 09 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $50 $260 Not Implemented
BS0099 # 04 Y:2017 04 2017 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $789 $144 Not Implemented
BS0099 # 03 Y:2017 03 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $866 $2,440 Not Implemented
BS0099 # 02 Y:2017 02 2017 ADOPT IN-HOUSE MATERIAL GENERATION $7,623 $60,000 Not Implemented
BS0099 # 01 Y:2017 01 2017 RECOVER AND REUSE WASTE MATERIAL $83,061 $200,000 Not Implemented
BS0097 # 05 Y:2017 05 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $319 $2,189 Not Implemented
BS0097 # 09 Y:2017 09 2017 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $140 $160 Not Implemented
BS0097 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $212 $277 Not Implemented
BS0097 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $236 $131 Not Implemented
BS0097 # 06 Y:2017 06 2017 ADOPT IN-HOUSE MATERIAL GENERATION $3,137 $60,000 Not Implemented
BS0097 # 04 Y:2017 04 2017 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $751 $5,250 Not Implemented
BS0097 # 03 Y:2017 03 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $6,781 $127,800 Not Implemented
BS0097 # 02 Y:2017 02 2017 TREAT AND REUSE RINSE WATERS $870 $8,674 Not Implemented
BS0097 # 01 Y:2017 01 2017 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,590 $2,959 Not Implemented
BS0001 # 06 Y:2012 06 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,034 $200 Implemented
BS0001 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,664 $1,616 Implemented
BS0001 # 03 Y:2012 03 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,703 $0 Implemented