IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
NAICS 3121 Beverage Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0770 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $206 $0 Not Implemented
OR0770 # 02 Y:2023 02 2023 REDUCE SCRAP PRODUCTION $111,700 $282,420 Not Implemented
OR0770 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,249 $9,000 Implemented
OR0770 # 01 Y:2023 01 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,142 $6,704 Implemented
OR0763 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $7,412 $89,663 Not Implemented
OR0763 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $5,819 $13,838 Not Implemented
OR0763 # 01 Y:2023 01 2023 ADOPT IN-HOUSE MATERIAL GENERATION $172,258 $46,346 Not Implemented
OR0753 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $14,927 $278,534 Not Implemented
OR0753 # 01 Y:2022 01 2022 MODIFY CURRENT INCENTIVE PROGRAM $1,000 $0 Not Implemented
OR0753 # 02 Y:2022 02 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $9,938 $40,624 Not Implemented
OR0745 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,360 $542 Implemented
OR0745 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,286 $485 Implemented
OR0745 # 01 Y:2021 01 2021 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $11,633 $395 Implemented
OR0734 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,078 $220 Not Implemented
OR0734 # 03 Y:2020 03 2020 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $20,357 $6,830 Not Implemented
OR0734 # 02 Y:2020 02 2020 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $44,429 $117,388 Not Implemented
OR0734 # 01 Y:2020 01 2020 INCREASE USE OF AUTOMATION $126,455 $360,000 Not Implemented
OR0725 # 03 Y:2019 03 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $126,211 $375,000 Implemented
OR0725 # 01 Y:2019 01 2019 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $16,581 $12,780 Not Implemented
OR0725 # 04 Y:2019 04 2019 REPLACE BOILER $2,159 $0 Not Implemented
OR0725 # 02 Y:2019 02 2019 RECOVER AND REUSE WASTE MATERIAL $58,445 $110,790 Implemented
OR0717 # 05 Y:2019 05 2019 RECOVER AND REUSE WASTE MATERIAL $204,215 $143,400 Not Implemented
OR0717 # 01 Y:2019 01 2019 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $1,163 $0 Implemented
OR0717 # 02 Y:2019 02 2019 MINIMIZE WATER USAGE $20,973 $587 Not Implemented
OR0717 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,061 $7,650 Not Implemented