IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 312111 Soft Drink Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0379 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,134 $14,723 Not Implemented
SU0379 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $899 $1,039 Not Implemented
SU0379 # 04 Y:2015 04 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,321 $4,766 Not Implemented
SU0379 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $390 $222 Not Implemented
SU0379 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,640 $1,169 Not Implemented
SU0379 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,836 $0 Not Implemented
SU0365 # 05 Y:2014 05 2014 INSULATE FEEDWATER TANK $686 $89 Not Implemented
SU0365 # 10 Y:2014 10 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,884 $49,000 Not Implemented
SU0365 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $180 $317 Implemented
SU0365 # 08 Y:2014 08 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,361 $2,353 Not Implemented
SU0365 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,452 $1,050 Implemented
SU0365 # 06 Y:2014 06 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $16,723 $4,216 Implemented
SU0365 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $5,139 $763 Not Implemented
SU0365 # 03 Y:2014 03 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,916 $0 Implemented
SU0365 # 02 Y:2014 02 2014 USE SYNTHETIC LUBRICANT $3,020 $0 Implemented
SU0365 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,680 $0 Implemented
SU0205 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,784 $0 Implemented
SU0205 # 07 Y:2005 07 2005 $2,182,664 $3,516,395 Not Implemented
SU0205 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $822 $1,010 Implemented
SU0205 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $5,926 $1,000 Implemented
SU0205 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,271 $560 Not Implemented
SU0205 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,803 $75 Implemented
SU0205 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,184 $0 Not Implemented