IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

429

matching recommendations
Reset
NAICS 31212 Breweries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0865 # 05 Y:2012 05 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,071 $1,500 Not Implemented
UD0865 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $992 $1,000 Not Implemented
UD0865 # 07 Y:2012 07 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $966 $1,600 Not Implemented
UD0865 # 08 Y:2012 08 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,463 $0 Not Implemented
UD0865 # 09 Y:2012 09 2012 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $4,015 $9,000 Not Implemented
UD0865 # 10 Y:2012 10 2012 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $3,073 $9,219 Not Implemented
UD0865 # 11 Y:2012 11 2012 RECOVER WASTE HEAT FROM EQUIPMENT $42,877 $83,500 Not Implemented
UD0865 # 12 Y:2012 12 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $20,832 $25,000 Not Implemented
UD0865 # 13 Y:2012 13 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $15,846 $24,600 Not Implemented
UD0865 # 14 Y:2012 14 2012 AVOID FROST FORMATION ON EVAPORATORS $7,322 $0 Not Implemented
UD0865 # 15 Y:2012 15 2012 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $14,957 $123,000 Not Implemented
OR0591 # 01 Y:2012 01 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $920,649 $25,909 Implemented
OR0591 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $93,821 $27,749 Not Implemented
OR0591 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,274 $6,968 Implemented
UM0352 # 01 Y:2009 01 2009 INSULATE FEEDWATER TANK $8,739 $3,454 Implemented
UM0352 # 02 Y:2009 02 2009 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,001 $11,363 Not Implemented
UM0352 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,300 $1,700 Implemented
UM0352 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $2,569 $1,060 Not Implemented
UM0352 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,200 $0 Implemented
UM0352 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,800 $1,900 Not Implemented
UM0352 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,454 $0 Implemented
UM0352 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $504 $920 Implemented
UM0352 # 09 Y:2009 09 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,944 $1,200 Implemented
IC0150 # 01 Y:2008 01 2008 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $391,205 $3,038,750 Not Implemented
IC0150 # 02 Y:2008 02 2008 REPAIR AND ELIMINATE STEAM LEAKS $1,054 $2,900 Not Implemented