IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

449

matching recommendations
Reset
NAICS 31213 Wineries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0763 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $7,412 $89,663 Not Implemented
OR0763 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $5,819 $13,838 Not Implemented
OR0763 # 01 Y:2023 01 2023 ADOPT IN-HOUSE MATERIAL GENERATION $172,258 $46,346 Not Implemented
MZ0328 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $302 $120 Not Implemented
MZ0328 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $1,438 $2,450 Not Implemented
MZ0328 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $2,047 $7,500 Not Implemented
MZ0328 # 01 Y:2022 01 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $57,088 $235,000 Not Implemented
SF0580 # 07 Y:2021 07 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $19,936 $49,917 Implemented
SF0580 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $228 $574 Implemented
SF0580 # 05 Y:2021 05 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,242 $2,702 Implemented
SF0580 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,463 $18,200 Implemented
SF0580 # 03 Y:2021 03 2021 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $69,715 $64,882 Not Implemented
SF0580 # 02 Y:2021 02 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,288 $1,410 Not Implemented
SF0580 # 01 Y:2021 01 2021 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $18,446 $0 Implemented
SF0570 # 11 Y:2021 11 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $179,262 $1,269,472 Implemented
SF0570 # 10 Y:2021 10 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,784 $27,535 Not Implemented
SF0570 # 09 Y:2021 09 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $291 $648 Implemented
SF0570 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,387 $6,315 Implemented
SF0570 # 07 Y:2021 07 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $39,174 $48,150 Not Implemented
SF0570 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $514 $190 Not Implemented
SF0570 # 01 Y:2021 01 2021 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $24,674 $0 Implemented
SF0570 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,893 $0 Implemented
SF0570 # 03 Y:2021 03 2021 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $149,399 $10,195 Implemented
SF0570 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $71,549 $5,641 Implemented
SF0570 # 05 Y:2021 05 2021 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $106,544 $31,500 Not Implemented