Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
458
matching recommendationsNAICS | 31213 | Wineries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0166 # 04 Y:2022 | 04 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,623 | $0 | Implemented |
IP0166 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $526 | $33 | Implemented |
IP0166 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,625 | $3,274 | Implemented |
IP0166 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,433 | $1,162 | Implemented |
IP0166 # 08 Y:2022 | 08 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $704 | $1,279 | Not Implemented |
IP0166 # 09 Y:2022 | 09 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $198 | $416 | Implemented |
IP0166 # 10 Y:2022 | 10 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $279 | $665 | Implemented |
IP0166 # 11 Y:2022 | 11 | 2022 | OPTIMIZE PLANT POWER FACTOR | $11,046 | $43,200 | Implemented |
IP0166 # 12 Y:2022 | 12 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $136 | $665 | Implemented |
OR0763 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $7,412 | $89,663 | Not Implemented |
OR0763 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $5,819 | $13,838 | Not Implemented |
OR0763 # 01 Y:2023 | 01 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $172,258 | $46,346 | Not Implemented |
MZ0328 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $302 | $120 | Not Implemented |
MZ0328 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $1,438 | $2,450 | Not Implemented |
MZ0328 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,047 | $7,500 | Not Implemented |
MZ0328 # 01 Y:2022 | 01 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $57,088 | $235,000 | Not Implemented |
SF0580 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $19,936 | $49,917 | Implemented |
SF0580 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $228 | $574 | Implemented |
SF0580 # 05 Y:2021 | 05 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,242 | $2,702 | Implemented |
SF0580 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,463 | $18,200 | Implemented |
SF0580 # 03 Y:2021 | 03 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $69,715 | $64,882 | Not Implemented |
SF0580 # 02 Y:2021 | 02 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,288 | $1,410 | Not Implemented |
SF0580 # 01 Y:2021 | 01 | 2021 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $18,446 | $0 | Implemented |
SF0570 # 11 Y:2021 | 11 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $179,262 | $1,269,472 | Implemented |
SF0570 # 10 Y:2021 | 10 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,784 | $27,535 | Not Implemented |