IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

87

matching recommendations
Reset
NAICS 31323 Nonwoven Fabric Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0667 # 03 Y:2021 03 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $4,354 $2,000 n/a
NC0667 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,346 $3,990 n/a
NC0667 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $756 $300 n/a
NC0667 # 04 Y:2021 04 2021 RECOVER WASTE HEAT FROM EQUIPMENT $10,960 $1,960 n/a
AS0499 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,118 $6,351 Implemented
AS0499 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,180 $1,532 Not Implemented
AS0499 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,171 $63 Implemented
AS0499 # 04 Y:2021 04 2021 UPGRADE CONTROLS ON COMPRESSORS $848 $607 Not Implemented
AS0499 # 08 Y:2021 08 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $97 $80 Not Implemented
AS0499 # 05 Y:2021 05 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $845 $2,880 Not Implemented
AS0499 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $624 $2,534 Not Implemented
AS0499 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $109 $394 Not Implemented
UA0175 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,666 $32,698 Implemented
UA0175 # 08 Y:2017 08 2017 INSTALL TIMERS AND/OR THERMOSTATS $402 $30 Implemented
UA0175 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,831 $250 Implemented
UA0175 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $633 $1,165 Implemented
UA0175 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,257 $390 Implemented
UA0175 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $51,456 $17,950 Not Implemented
UA0175 # 02 Y:2017 02 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $42,445 $13,900 Implemented
UA0175 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,388 $17,404 Implemented
NC0576 # 04 Y:2016 04 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $60,776 $250,000 Not Implemented
NC0576 # 03 Y:2016 03 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $198,172 $1,100,000 Not Implemented
NC0576 # 02 Y:2016 02 2016 REPAIR OR REPLACE STEAM TRAPS $108,434 $80,000 Implemented
NC0576 # 01 Y:2016 01 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,790 $3,000 Implemented
MA0755 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $9,821 $4,300 Not Implemented