Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
22
matching recommendationsNAICS | 313310 | Textile and Fabric Finishing Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0487 # 01 Y:2020 | 01 | 2020 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $728 | $40 | Implemented |
LE0487 # 11 Y:2020 | 11 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,929 | $30,000 | Implemented |
LE0487 # 10 Y:2020 | 10 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,832 | $8,000 | Implemented |
LE0487 # 09 Y:2020 | 09 | 2020 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $4,451 | $15,000 | Implemented |
LE0487 # 08 Y:2020 | 08 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $27,628 | $85,000 | Not Implemented |
LE0487 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,408 | $16,552 | Implemented |
LE0487 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $399 | $975 | Implemented |
LE0487 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,823 | $10,000 | Implemented |
LE0487 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,594 | $10,000 | Not Implemented |
LE0487 # 03 Y:2020 | 03 | 2020 | REPAIR OR REPLACE STEAM TRAPS | $11,267 | $5,000 | Implemented |
LE0487 # 02 Y:2020 | 02 | 2020 | INSULATE BARE EQUIPMENT | $5,562 | $1,833 | Implemented |
LE0291 # 01 Y:2009 | 01 | 2009 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $32,078 | $50,000 | Not Implemented |
LE0291 # 11 Y:2009 | 11 | 2009 | INSTALL OCCUPANCY SENSORS | $3,572 | $1,050 | Not Implemented |
LE0291 # 10 Y:2009 | 10 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,803 | $19,856 | Not Implemented |
LE0291 # 09 Y:2009 | 09 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,236 | $81,400 | Not Implemented |
LE0291 # 08 Y:2009 | 08 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,836 | $560 | Implemented |
LE0291 # 07 Y:2009 | 07 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,975 | $3,460 | Not Implemented |
LE0291 # 06 Y:2009 | 06 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $2,837 | $125 | Not Implemented |
LE0291 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,439 | $1,600 | Not Implemented |
LE0291 # 04 Y:2009 | 04 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,457 | $1,120 | Implemented |
LE0291 # 03 Y:2009 | 03 | 2009 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,557 | $2,500 | Implemented |
LE0291 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,489 | $510 | Not Implemented |