IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

205

matching recommendations
Reset
NAICS 31499 All Other Textile Product Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0115 # 03 Y:2013 03 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,400 $16,000 Not Implemented
DL0115 # 02 Y:2013 02 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,900 $350 Implemented
DL0115 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,106 $0 Implemented
DL0083 # 12 Y:2012 12 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $300 $100 Implemented
DL0083 # 11 Y:2012 11 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $600 $100 Implemented
DL0083 # 10 Y:2012 10 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $1,050 $100 Implemented
DL0083 # 09 Y:2012 09 2012 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,190 $150 Not Implemented
DL0083 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $10,690 $3,000 Not Implemented
DL0083 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,150 $100 Not Implemented
DL0083 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $9,950 $100 Implemented
DL0083 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,960 $5,400 Implemented
DL0083 # 05 Y:2012 05 2012 RECOVER WASTE HEAT FROM EQUIPMENT $465 $2,100 Not Implemented
DL0083 # 06 Y:2012 06 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,920 $4,750 Implemented
DL0083 # 07 Y:2012 07 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $12,480 $2,500 Not Implemented
DL0083 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,964 $28,300 Not Implemented
MI0214 # 05 Y:2012 05 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $948 $1,058 Implemented
MI0214 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $564 $1,860 Not Implemented
MI0214 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $976 $1,505 Not Implemented
MI0214 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $986 $1,320 Implemented
MI0214 # 02 Y:2012 02 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,740 $2,600 Implemented
MI0214 # 01 Y:2012 01 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,941 $50,000 Not Implemented
MA0671 # 03 Y:2011 03 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $1,556 $15,000 Not Implemented
MA0671 # 01 Y:2011 01 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $36,635 $200,000 Not Implemented
MA0671 # 02 Y:2011 02 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $4,780 $3,550 Implemented
MA0671 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $1,328 $2,220 Not Implemented