IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 32121 Veneer, Plywood, and Engineered Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0241 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $149,914 $3,400 Implemented
LL0241 # 13 Y:2006 13 2006 INSULATE BARE EQUIPMENT $280 $409 Implemented
LL0241 # 12 Y:2006 12 2006 INSTALL OCCUPANCY SENSORS $213 $270 Not Implemented
LL0241 # 11 Y:2006 11 2006 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $715 $1,400 Not Implemented
LL0241 # 10 Y:2006 10 2006 INSULATE BARE EQUIPMENT $1,977 $2,653 Implemented
LL0241 # 09 Y:2006 09 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,743 $2,445 Not Implemented
LL0241 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,567 $1,700 Implemented
LL0241 # 07 Y:2006 07 2006 USE PHOTOCELL CONTROLS $3,211 $600 Implemented
LL0241 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,436 $30 Not Implemented
LL0241 # 05 Y:2006 05 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $20,822 $1,320 Implemented
LL0241 # 04 Y:2006 04 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $55,105 $40,000 Not Implemented
LL0241 # 03 Y:2006 03 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $77,103 $3,196 Implemented
LL0241 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $178,198 $64,440 Implemented
LL0237 # 01 Y:2005 01 2005 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $3,092,622 $0 Not Implemented
LL0237 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $46,200 $2,600 Implemented
LL0237 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $51,555 $15,000 Implemented
LL0237 # 04 Y:2005 04 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $34,402 $1,400 Implemented
LL0237 # 05 Y:2005 05 2005 USE PHOTOCELL CONTROLS $22,793 $0 Not Implemented
LL0237 # 06 Y:2005 06 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,071 $0 Not Implemented
LL0237 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $1,195 $0 Not Implemented
LL0237 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,527 $1,930 Implemented