IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

432

matching recommendations
Reset
NAICS 32199 All Other Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0767 # 03 Y:2023 03 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $300,390 $200,000 Implemented
OR0767 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,167 $14,238 Not Implemented
OR0767 # 02 Y:2023 02 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $172,773 $37,200 Implemented
OR0767 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,428 $5,428 Not Implemented
OR0767 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,793 $0 Not Implemented
IP0165 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $6,564 $11,200 Not Implemented
IP0165 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $533 $23 Not Implemented
IP0165 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $693 $0 Not Implemented
WV0626 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $454 $467 Implemented
WV0626 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $792 $3,586 Implemented
WV0626 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $7,261 $14,000 Not Implemented
WV0626 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,860 $7,799 Implemented
WV0626 # 09 Y:2022 09 2022 DEVELOP A REPAIR/REPLACE POLICY $291 $1,347 Implemented
WV0626 # 04 Y:2022 04 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,566 $12,480 Not Implemented
WV0626 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,701 $160 Implemented
WV0626 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $301 $40 Implemented
WV0626 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $1,324 $3,185 Not Implemented
MS0397 # 01 Y:2022 01 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $851 $7,078 Not Implemented
MS0397 # 02 Y:2022 02 2022 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,868 $2,607 Not Implemented
MS0397 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,556 $1,796 Not Implemented
AS0519 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,189 $17,273 Implemented
AS0519 # 05 Y:2022 05 2022 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,322 $7,738 Implemented
AS0519 # 03 Y:2022 03 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $12,742 $43,469 Not Implemented
AS0519 # 07 Y:2022 07 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $352 $830 Implemented
AS0519 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,335 $11,420 Implemented