IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,971

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0714 # 03 Y:2016 03 2016 OPTIMIZE PLANT POWER FACTOR $11,140 $13,490 Not Implemented
AM0714 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,435 $1,000 Implemented
AM0714 # 05 Y:2016 05 2016 CHECK FOR ACCURACY OF UTILITY / POWER METERS $5,800 $0 Not Implemented
AM0714 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,555 $4,700 Not Implemented
AM0714 # 07 Y:2016 07 2016 DISCONNECT BALLASTS $650 $0 Not Implemented
AM0714 # 08 Y:2016 08 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $330 $0 Not Implemented
AM0714 # 09 Y:2016 09 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $320 $730 Not Implemented
BS0075 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,685 $1,464 Implemented
BS0075 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $513 $502 Implemented
BS0075 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $146 $52 Implemented
BS0075 # 04 Y:2016 04 2016 UPGRADE CONTROLS ON COMPRESSORS $7,616 $3,250 Implemented
BS0075 # 05 Y:2016 05 2016 MINIMIZE WATER USAGE $256 $53 Implemented
BS0075 # 06 Y:2016 06 2016 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $73,741 $24,334 Implemented
IP0070 # 01 Y:2016 01 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $575 $0 Not Implemented
IP0070 # 02 Y:2016 02 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,543 $74 Implemented
IP0070 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,137 $40 Implemented
IP0070 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $996 $113 Implemented
IP0070 # 05 Y:2016 05 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $492 $720 Not Implemented
IP0070 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,285 $9,938 Not Implemented
OK0943 # 01 Y:2016 01 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $40,741 $19,000 Implemented
OK0943 # 02 Y:2016 02 2016 PAY UTILITY BILLS ON TIME $21,826 $0 Implemented
OK0943 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,211 $0 Implemented
OK0943 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,792 $250 Not Implemented
OK0943 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,584 $1,350 Not Implemented
OK0943 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $645 $1,405 Implemented