IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

68

matching recommendations
Reset
NAICS 323 Printing and Related Support Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0093 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,581 $12,490 Not Implemented
WM0093 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,507 $0 Not Implemented
WM0093 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $5,944 $2,280 Not Implemented
WM0093 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $593 $1,400 Not Implemented
WM0093 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,192 $2,750 Not Implemented
WM0093 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,577 $1,680 Implemented
BD0478 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,978 $3,229 Implemented
BD0478 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $784 $900 Implemented
BD0478 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,217 $1,000 Implemented
BD0478 # 08 Y:2016 08 2016 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $13,019 $7,560 Implemented
BD0478 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $751 $450 Not Implemented
BD0478 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,961 $15 Implemented
BD0478 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,345 $15 Not Implemented
BD0478 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,111 $575 Not Implemented
IC0184 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,196 $20,077 Implemented
IC0184 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,671 $21,422 Implemented
IC0184 # 01 Y:2011 01 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $265,693 $277,838 Not Implemented
IC0184 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,215 $5,303 Implemented
IC0184 # 06 Y:2011 06 2011 USE RADIANT HEATER FOR SPOT HEATING $2,000 $7,588 Implemented
IC0184 # 07 Y:2011 07 2011 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $65,425 $345,000 Not Implemented
IC0184 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,121 $3,748 Implemented
BD0383 # 01 Y:2011 01 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $22,085 $7,000 Not Implemented
BD0383 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,355 $7,633 Not Implemented
BD0383 # 03 Y:2011 03 2011 USE RADIANT HEATER FOR SPOT HEATING $8,456 $4,240 Not Implemented
BD0383 # 04 Y:2011 04 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,708 $1,620 Not Implemented