IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 323 Printing and Related Support Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0177 # 04 Y:2017 04 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $39,860 $40,000 Not Implemented
DL0177 # 03 Y:2017 03 2017 REPAIR AND ELIMINATE STEAM LEAKS $12,079 $3,000 Not Implemented
DL0177 # 02 Y:2017 02 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $10,881 $2,032 Not Implemented
DL0177 # 01 Y:2017 01 2017 OPERATE BOILERS ON HIGH FIRE SETTING $16,174 $28,750 Not Implemented
DL0163 # 01 Y:2016 01 2016 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $30,630 $2,700 Implemented
DL0163 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,160 $7,000 Not Implemented
DL0163 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,570 $200 Not Implemented
DL0163 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,110 $55,940 Implemented
DL0051 # 06 Y:2010 06 2010 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $4,250 $960 Not Implemented
DL0051 # 03 Y:2010 03 2010 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $940 $30 Implemented
DL0051 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $573 $0 Implemented
DL0051 # 01 Y:2010 01 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,124 $0 Implemented
DL0051 # 07 Y:2010 07 2010 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $4,473 $3,840 Not Implemented
DL0051 # 09 Y:2010 09 2010 REPLACE BOILER $6,600 $16,743 Implemented
DL0051 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $860 $150 Not Implemented
DL0051 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,720 $20,796 Not Implemented
DL0051 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,500 $100 Implemented
DL0027 # 03 Y:2008 03 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,514 $52,000 Implemented
DL0027 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,691 $27,814 Not Implemented
DL0027 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $8,800 $0 Implemented
DL0002 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,771 $62,783 Not Implemented
DL0002 # 04 Y:2007 04 2007 USE SOLAR HEAT TO HEAT MAKE-UP AIR $20,592 $100,100 Not Implemented
DL0002 # 03 Y:2007 03 2007 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $19,418 $73,950 Not Implemented
DL0002 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,414 $10,000 Not Implemented
WV0352 # 12 Y:2006 12 2006 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $325 $38 Not Implemented