IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,874

matching recommendations
Reset
NAICS 32311 Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0519 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,974 $333 Implemented
WV0519 # 09 Y:2016 09 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,944 $155 Implemented
WV0519 # 10 Y:2016 10 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,228 $0 Implemented
WV0519 # 11 Y:2016 11 2016 INSULATE BARE EQUIPMENT $247 $439 Not Implemented
MI0291 # 01 Y:2016 01 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $49,064 $180,000 Not Implemented
MI0291 # 02 Y:2016 02 2016 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $13,909 $22,520 Not Implemented
MI0291 # 03 Y:2016 03 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $11,963 $23,683 Not Implemented
MI0291 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,153 $1,660 Implemented
MI0291 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,659 $40 Implemented
MI0291 # 06 Y:2016 06 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,876 $40 Implemented
MI0291 # 07 Y:2016 07 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $2,625 $3,600 Implemented
MI0291 # 08 Y:2016 08 2016 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $2,195 $1,128 Not Implemented
MI0291 # 09 Y:2016 09 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,071 $120 Implemented
MI0291 # 10 Y:2016 10 2016 PAY UTILITY BILLS ON TIME $1,589 $0 Implemented
MI0291 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,180 $760 Implemented
MI0291 # 12 Y:2016 12 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,118 $4,691 Not Implemented
MI0291 # 13 Y:2016 13 2016 INSTALL OCCUPANCY SENSORS $889 $683 Implemented
SU0403 # 01 Y:2016 01 2016 INSTALL SPECTRAL REFLECTORS / DELAMP $282 $0 Not Implemented
SU0403 # 02 Y:2016 02 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,987 $0 Not Implemented
SU0403 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $887 $822 Implemented
SU0403 # 04 Y:2016 04 2016 ELIMINATE/REDUCE AN OPERATION $1,628 $5,950 Not Implemented
MI0289 # 01 Y:2015 01 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,332 $40 Not Implemented
MI0289 # 02 Y:2015 02 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,812 $11,680 Implemented
MI0289 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,148 $18,346 Not Implemented
MI0289 # 04 Y:2015 04 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,858 $19,974 Implemented