Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
69
matching recommendationsNAICS | 323111 | Commercial Printing (except Screen and Books) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0316 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,450 | $3,794 | n/a |
IC0316 # 11 Y:2025 | 11 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,060 | $0 | n/a |
IC0316 # 10 Y:2025 | 10 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $525 | $205 | n/a |
IC0316 # 09 Y:2025 | 09 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,406 | $3,393 | n/a |
IC0316 # 08 Y:2025 | 08 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,349 | $3,386 | n/a |
IC0316 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $93 | $379 | n/a |
IC0316 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,822 | $728 | n/a |
IC0316 # 12 Y:2025 | 12 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,025 | $1,615 | n/a |
IC0316 # 13 Y:2025 | 13 | 2025 | REPLACE BOILER | $36,754 | $57,900 | n/a |
IC0316 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $198 | $144 | n/a |
IC0316 # 07 Y:2025 | 07 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $21,124 | $3,628 | n/a |
IC0316 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,039 | $346 | n/a |
IC0316 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $89,150 | $489,314 | n/a |
WM0093 # 05 Y:2016 | 05 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,192 | $2,750 | Not Implemented |
WM0093 # 03 Y:2016 | 03 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,944 | $2,280 | Not Implemented |
WM0093 # 02 Y:2016 | 02 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,507 | $0 | Not Implemented |
WM0093 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,577 | $1,680 | Implemented |
WM0093 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,581 | $12,490 | Not Implemented |
WM0093 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $593 | $1,400 | Not Implemented |
BD0478 # 08 Y:2016 | 08 | 2016 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $13,019 | $7,560 | Implemented |
BD0478 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $751 | $450 | Not Implemented |
BD0478 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,217 | $1,000 | Implemented |
BD0478 # 06 Y:2016 | 06 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $784 | $900 | Implemented |
BD0478 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,978 | $3,229 | Implemented |
BD0478 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,961 | $15 | Implemented |