Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,748
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2321 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,194 | $18,538 | Not Implemented |
KS2321 # 06 Y:2023 | 06 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $125,249 | $627,000 | Implemented |
KS2321 # 07 Y:2023 | 07 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,241 | $1,770 | Not Implemented |
KS2321 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $29,979 | $30 | Not Implemented |
WV0650 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $38,505 | $113,760 | Not Implemented |
WV0650 # 02 Y:2023 | 02 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $16,578 | $21,335 | Not Implemented |
WV0650 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $10,058 | $35,930 | Implemented |
WV0650 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,350 | $15,114 | Implemented |
WV0650 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,595 | $891 | Implemented |
WV0650 # 06 Y:2023 | 06 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,134 | $21,176 | Not Implemented |
WV0650 # 07 Y:2023 | 07 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,598 | $1,500 | Implemented |
WV0650 # 08 Y:2023 | 08 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $4,052 | $8,935 | Implemented |
WV0650 # 09 Y:2023 | 09 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,956 | $2,040 | Not Implemented |
WV0650 # 10 Y:2023 | 10 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $136 | $388 | Implemented |
UC2307 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $12,379 | $0 | Not Implemented |
UC2307 # 02 Y:2023 | 02 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $4,994 | $0 | Not Implemented |
UC2307 # 03 Y:2023 | 03 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $352 | $0 | Not Implemented |
UC2307 # 04 Y:2023 | 04 | 2023 | REPLACE BOILER | $6,269 | $41,061 | Not Implemented |
UC2307 # 05 Y:2023 | 05 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $508 | $529 | Not Implemented |
UC2307 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $411 | $3,486 | Not Implemented |
UC2307 # 07 Y:2023 | 07 | 2023 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $3,643 | $34,992 | Not Implemented |
UC2307 # 08 Y:2023 | 08 | 2023 | METER WASTE WATER | $383 | $455 | Not Implemented |
UC2307 # 09 Y:2023 | 09 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,108 | $31,637 | Not Implemented |
UC2307 # 10 Y:2023 | 10 | 2023 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,667 | $13,200 | Not Implemented |
UF0598 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $94,792 | $289,896 | Not Implemented |