Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
61
matching recommendationsNAICS | 32521 | Resin and Synthetic Rubber Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2417 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $63,875 | $514,800 | n/a |
LS2417 # 06 Y:2024 | 06 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $33,694 | $120,300 | n/a |
LS2417 # 05 Y:2024 | 05 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $9,379 | $28,000 | n/a |
LS2417 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,173 | $90 | n/a |
LS2417 # 04 Y:2024 | 04 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $182,554 | $481,830 | n/a |
LS2417 # 01 Y:2024 | 01 | 2024 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,135 | $75 | n/a |
LS2417 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $82,069 | $99,800 | n/a |
LS2216 # 09 Y:2022 | 09 | 2022 | USE EVAPORATION TO CONCENTRATE MATERIAL | $104,200 | $500,000 | Not Implemented |
LS2216 # 08 Y:2022 | 08 | 2022 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $49,168 | $91,825 | Not Implemented |
LS2216 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $42 | $50 | Not Implemented |
LS2216 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,044 | $18,502 | Implemented |
LS2216 # 04 Y:2022 | 04 | 2022 | INSTALL OCCUPANCY SENSORS | $1,095 | $350 | Implemented |
LS2216 # 03 Y:2022 | 03 | 2022 | USE PHOTOCELL CONTROLS | $251 | $74 | Implemented |
LS2216 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,917 | $450 | Not Implemented |
LS2216 # 01 Y:2022 | 01 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $1,899 | $150 | Not Implemented |
LS2216 # 07 Y:2022 | 07 | 2022 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $50,000 | $64,300 | Not Implemented |
LS2207 # 04 Y:2022 | 04 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,650 | $158,575 | Implemented |
LS2207 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $136,185 | $2,775,000 | Not Implemented |
LS2207 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,432 | $32,496 | Implemented |
LS2207 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,876 | $30,073 | Implemented |
LS2207 # 01 Y:2022 | 01 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $1,349 | $350 | Not Implemented |
LS1907 # 03 Y:2019 | 03 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $180 | $75 | Not Implemented |
LS1907 # 04 Y:2019 | 04 | 2019 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $305 | $180 | Not Implemented |
LS1907 # 05 Y:2019 | 05 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $40 | $25 | Not Implemented |
LS1907 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,396 | $6,225 | Not Implemented |