Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 3253 | Pesticide, Fertilizer, and Other Agricultural Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0348 # 09 Y:2004 | 09 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,977 | $456 | Implemented |
UF0348 # 06 Y:2004 | 06 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $39,206 | $74,000 | Implemented |
UF0348 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,420 | $22,100 | Not Implemented |
UF0348 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,169 | $10,500 | Implemented |
UF0348 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,249 | $0 | Implemented |
UF0348 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,420 | $29,400 | Implemented |
UF0348 # 01 Y:2004 | 01 | 2004 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,333,121 | $2,700,000 | Implemented |
UF0348 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,203 | $6,441 | Implemented |
UF0348 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,366 | $0 | Not Implemented |
UF0348 # 10 Y:2004 | 10 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,760 | $0 | Implemented |
MS0258 # 09 Y:2004 | 09 | 2004 | USE PHOTOCELL CONTROLS | $2,197 | $556 | Not Implemented |
MS0258 # 12 Y:2004 | 12 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $652 | $432 | Not Implemented |
MS0258 # 11 Y:2004 | 11 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $917 | $236 | Not Implemented |
MS0258 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,287 | $1,192 | Not Implemented |
MS0258 # 08 Y:2004 | 08 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,706 | $211 | Not Implemented |
MS0258 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,220 | $400 | Not Implemented |
MS0258 # 06 Y:2004 | 06 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,547 | $28,092 | Not Implemented |
MS0258 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $9,148 | $698 | Not Implemented |
MS0258 # 04 Y:2004 | 04 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,838 | $7,618 | Not Implemented |
MS0258 # 03 Y:2004 | 03 | 2004 | INCREASE AMOUNT OF CONDENSATE RETURNED | $17,029 | $5,830 | Not Implemented |
MS0258 # 02 Y:2004 | 02 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $17,390 | $2,000 | Not Implemented |
MS0258 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $27,618 | $3,865 | Not Implemented |
UF0349 # 04 Y:2004 | 04 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,922 | $9,158 | Not Implemented |
UF0349 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,231 | $4,583 | Not Implemented |
UF0349 # 02 Y:2004 | 02 | 2004 | ADD AREA LIGHTING SWITCHES | $1,188 | $6,111 | Not Implemented |