ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0089 # 02 Y:2012 | 02 | 2012 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $7,675 | $27,000 | Implemented |
DL0089 # 03 Y:2012 | 03 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,880 | $0 | Implemented |
DL0089 # 04 Y:2012 | 04 | 2012 | REDUCE VENTILATION AIR | $620 | $81 | Implemented |
DL0089 # 05 Y:2012 | 05 | 2012 | USE OPTIMUM THICKNESS INSULATION | $1,025 | $2,275 | Not Implemented |
DL0089 # 01 Y:2012 | 01 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,050 | $6,800 | Implemented |
MZ0090 # 06 Y:2012 | 06 | 2012 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $3,072 | $12,000 | Not Implemented |
MZ0090 # 05 Y:2012 | 05 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,567 | $23,196 | Not Implemented |
MZ0090 # 04 Y:2012 | 04 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $403 | $1,159 | Not Implemented |
MZ0090 # 03 Y:2012 | 03 | 2012 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $296 | $360 | Not Implemented |
MZ0090 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $24 | $110 | Not Implemented |
MZ0090 # 01 Y:2012 | 01 | 2012 | INSTALL OCCUPANCY SENSORS | $185 | $220 | Not Implemented |
MA0688 # 06 Y:2012 | 06 | 2012 | INSTALL OCCUPANCY SENSORS | $1,689 | $4,605 | Implemented |
MA0688 # 05 Y:2012 | 05 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,762 | $15,050 | Not Implemented |
MA0688 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,988 | $1,800 | Not Implemented |
MA0688 # 03 Y:2012 | 03 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,644 | $2,250 | Implemented |
MA0688 # 02 Y:2012 | 02 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $10,004 | $9,352 | Implemented |
MA0688 # 01 Y:2012 | 01 | 2012 | REDUCE VENTILATION AIR | $22,622 | $21,500 | Not Implemented |
MAS015 # 01 Y:2012 | 01 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,716 | $4,442 | Not Implemented |
MAS015 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,906 | $9,000 | Not Implemented |
MAS015 # 03 Y:2012 | 03 | 2012 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $1,535 | $3,900 | Not Implemented |