IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
Reset
NAICS 3259 Other Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0232 # 06 Y:2020 06 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $105,703 $46,122 Not Implemented
UA0232 # 05 Y:2020 05 2020 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,009 $3,457 Not Implemented
UA0232 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $2,139 $205 Not Implemented
UA0232 # 03 Y:2020 03 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,046 $50 Not Implemented
UA0232 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,270 $16,429 Not Implemented
UA0232 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,011 $9,712 Not Implemented
UA0190 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $2,572 $1,253 Not Implemented
UA0190 # 09 Y:2018 09 2018 RECOVER WASTE HEAT FROM EQUIPMENT $2,007 $1,612 Not Implemented
UA0190 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $150 $258 Implemented
UA0190 # 07 Y:2018 07 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,316 $2,353 Not Implemented
UA0190 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,214 $250 Not Implemented
UA0190 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,642 $1,165 Implemented
UA0190 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $1,309 $2,048 Implemented
UA0190 # 03 Y:2018 03 2018 USE PHOTOCELL CONTROLS $2,331 $707 Implemented
UA0190 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,588 $24,837 Not Implemented
UA0100 # 01 Y:2013 01 2013 INSTALL TIMERS AND/OR THERMOSTATS $6,757 $1,062 Implemented
UA0100 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,852 $11,493 Not Implemented
UA0100 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,332 $1,800 Implemented
UA0100 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $70 $43 Implemented