Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
596
matching recommendationsNAICS | 325998 | All Other Miscellaneous Chemical Product and Preparation Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2317 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $511 | $476 | Implemented |
LS2317 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $207 | $175 | Implemented |
LS2317 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $223 | $50 | Implemented |
LS2317 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $344 | $45 | Implemented |
UC2307 # 10 Y:2023 | 10 | 2023 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,667 | $13,200 | Not Implemented |
UC2307 # 09 Y:2023 | 09 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,108 | $31,637 | Not Implemented |
UC2307 # 08 Y:2023 | 08 | 2023 | METER WASTE WATER | $383 | $455 | Not Implemented |
UC2307 # 07 Y:2023 | 07 | 2023 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $3,643 | $34,992 | Not Implemented |
UC2307 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $411 | $3,486 | Not Implemented |
UC2307 # 05 Y:2023 | 05 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $508 | $529 | Not Implemented |
UC2307 # 04 Y:2023 | 04 | 2023 | REPLACE BOILER | $6,269 | $41,061 | Not Implemented |
UC2307 # 03 Y:2023 | 03 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $352 | $0 | Not Implemented |
UC2307 # 02 Y:2023 | 02 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $4,994 | $0 | Not Implemented |
UC2307 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $12,379 | $0 | Not Implemented |
UL2301 # 05 Y:2023 | 05 | 2023 | ADOPT IN-HOUSE MATERIAL GENERATION | $85,200 | $50,198 | Not Implemented |
UL2301 # 04 Y:2023 | 04 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,944 | $0 | Not Implemented |
UL2301 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $33,531 | $260,163 | Not Implemented |
UL2301 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,141 | $9,184 | Not Implemented |
UL2301 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,408 | $2,832 | Implemented |
UD1056 # 05 Y:2023 | 05 | 2023 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $17,114 | $3,100 | Implemented |
UD1056 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,442 | $0 | Implemented |
UD1056 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,193 | $0 | Implemented |
UD1056 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,573 | $0 | Implemented |
UD1056 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,474 | $250 | Implemented |
UD1056 # 06 Y:2023 | 06 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,784 | $0 | Implemented |