IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

452

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0422 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $109,428 $738,652 Not Implemented
UF0592 # 01 Y:2023 01 2023 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $73,113 $215,600 Not Implemented
UF0592 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $56,023 $88,370 Implemented
UF0592 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $30,274 $30,607 Implemented
UF0592 # 04 Y:2023 04 2023 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $15,287 $18,600 Implemented
UF0592 # 05 Y:2023 05 2023 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $9,922 $11,796 Implemented
UF0592 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,412 $25,400 Not Implemented
UF0592 # 07 Y:2023 07 2023 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,981 $508 Implemented
UF0592 # 08 Y:2023 08 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,672 $1,200 Implemented
UF0592 # 09 Y:2023 09 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,580 $600 Implemented
UF0592 # 10 Y:2023 10 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $62,417 $10,000 Implemented
UF0592 # 11 Y:2023 11 2023 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $12,544 $20,214 Not Implemented
MI0407 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $2,200 Not Implemented
MI0407 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,645 $520 Not Implemented
MI0407 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,291 $580 Implemented
MI0407 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $2,509 $850 Not Implemented
MI0407 # 02 Y:2022 02 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,700 $3,310 Not Implemented
MI0407 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,140 $7,899 Implemented
MI0390 # 04 Y:2021 04 2021 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,586 $1,120 Not Implemented
MI0390 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $3,477 Implemented
MI0390 # 02 Y:2021 02 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,349 $7,564 Not Implemented
MI0390 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,273 $1,040 Implemented
MI0377 # 11 Y:2020 11 2020 INSULATE BARE EQUIPMENT $688 $682 Not Implemented
MI0377 # 10 Y:2020 10 2020 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $744 $965 Not Implemented
MI0377 # 09 Y:2020 09 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,158 $1,827 Not Implemented