IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

166

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0611 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $36,892 $25,400 n/a
UF0611 # 01 Y:2024 01 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $99,213 $111,120 n/a
UF0611 # 08 Y:2024 08 2024 INSTALL TURBULATORS $2,454 $3,750 n/a
UF0611 # 06 Y:2024 06 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,901 $7,320 n/a
UF0611 # 05 Y:2024 05 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,576 $19,104 n/a
UF0611 # 03 Y:2024 03 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $30,134 $5,900 n/a
UF0611 # 04 Y:2024 04 2024 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $26,100 $0 n/a
UF0611 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,650 $720 n/a
KS2322 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $7,983 $18,288 n/a
KS2322 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,624 $0 n/a
KS2322 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $86,162 $716,165 n/a
KS2322 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,242 $12,482 n/a
KS2322 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $491 $60 n/a
KS2322 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,387 $5,480 n/a
KS2322 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $374 $250 n/a
KS2318 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $43,077 $421,486 n/a
KS2318 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,814 $28,960 n/a
KS2318 # 01 Y:2023 01 2023 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $14,419 $320 n/a
KS2318 # 04 Y:2023 04 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,238 $1,864 n/a
KS2318 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,448 $8,951 n/a
KS2318 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $224 $765 n/a
KS2318 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,203 $60 n/a
KS2311 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $57,047 $422,421 Not Implemented
KS2311 # 02 Y:2023 02 2023 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $19,596 $10,708 Not Implemented
KS2311 # 03 Y:2023 03 2023 INSULATE FEEDWATER TANK $4,841 $4,104 Not Implemented