Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsNAICS | 326113 | Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0454 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,821 | $20,500 | Not Implemented |
LE0454 # 06 Y:2018 | 06 | 2018 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $9,261 | $28,000 | Not Implemented |
LE0454 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,723 | $1,500 | Implemented |
LE0454 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,301 | $23,000 | Implemented |
LE0454 # 02 Y:2018 | 02 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $554 | $300 | Implemented |
LE0454 # 03 Y:2018 | 03 | 2018 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $40,361 | $48,000 | Implemented |
LE0454 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,855 | $8,000 | Implemented |
LE0454 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $895 | $4,400 | Implemented |
LE0453 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,972 | $1,125 | Not Implemented |
LE0453 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,507 | $11,250 | Implemented |
LE0453 # 08 Y:2018 | 08 | 2018 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $27,940 | $105,000 | Not Implemented |
LE0453 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,514 | $19,688 | Implemented |
LE0453 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,499 | $3,938 | Implemented |
LE0453 # 03 Y:2018 | 03 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,248 | $4,000 | Not Implemented |
LE0453 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $1,037 | $1,550 | Not Implemented |
LE0453 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $70,484 | $4,500 | Implemented |
LE0373 # 09 Y:2014 | 09 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $681 | $1,400 | Not Implemented |
LE0373 # 01 Y:2014 | 01 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,983 | $0 | Implemented |
LE0373 # 02 Y:2014 | 02 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $35,793 | $130,000 | Implemented |
LE0373 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,233 | $1,000 | Implemented |
LE0373 # 04 Y:2014 | 04 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $3,209 | $1,225 | Implemented |
LE0373 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,176 | $4,410 | Not Implemented |
LE0373 # 06 Y:2014 | 06 | 2014 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $9,750 | $6,900 | Not Implemented |
LE0373 # 07 Y:2014 | 07 | 2014 | REPLACE BOILER | $93,869 | $72,460 | Not Implemented |
LE0373 # 05 Y:2014 | 05 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,652 | $2,400 | Implemented |