IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,921

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2313 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $873 $1,300 n/a
UC2313 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $251 $50 n/a
UC2313 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,805 $75 n/a
UC2313 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,884 $16,157 n/a
UC2313 # 09 Y:2023 09 2023 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $4,673 $19,488 n/a
UC2313 # 10 Y:2023 10 2023 INSTALL TIMERS AND/OR THERMOSTATS $615 $1,053 n/a
SJ0007 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $128,947 $765,487 Not Implemented
SJ0007 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,271 $13,090 Not Implemented
SJ0007 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $951 $495 Not Implemented
SJ0007 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $192 $0 Not Implemented
SJ0007 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,529 $0 Not Implemented
SJ0007 # 06 Y:2023 06 2023 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $31,866 $36,311 Not Implemented
SJ0007 # 07 Y:2023 07 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $47,492 $0 Not Implemented
SJ0007 # 08 Y:2023 08 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,635 $0 Not Implemented
WV0652 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $193,156 $160,000 Not Implemented
WV0652 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,958 $210,200 Not Implemented
WV0652 # 03 Y:2023 03 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $22,798 $1,500 Implemented
WV0652 # 04 Y:2023 04 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,975 $1,500 Implemented
WV0652 # 05 Y:2023 05 2023 DEVELOP A REPAIR/REPLACE POLICY $13,792 $1,942 Implemented
WV0652 # 06 Y:2023 06 2023 UPGRADE CONTROLS ON COMPRESSORS $8,659 $22,700 Not Implemented
WV0652 # 07 Y:2023 07 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,902 $2,750 Implemented
WV0652 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,967 $2,160 Implemented
WV0652 # 09 Y:2023 09 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,118 $7,210 Implemented
WV0652 # 10 Y:2023 10 2023 INSULATE BARE EQUIPMENT $506 $166 Implemented
UW2309 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,420 $4,240 Implemented