Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2305 # 04 Y:2023 | 04 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $9,833 | $0 | Implemented |
UC2305 # 12 Y:2023 | 12 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $17,010 | $126,560 | Not Implemented |
UC2305 # 11 Y:2023 | 11 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,248 | $43,351 | Not Implemented |
UC2305 # 10 Y:2023 | 10 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $25,926 | $115,275 | Not Implemented |
UC2305 # 09 Y:2023 | 09 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,885 | $28,876 | Implemented |
UC2305 # 08 Y:2023 | 08 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $173 | $30 | Not Implemented |
UC2305 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $510 | $1,300 | Implemented |
UC2305 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $414 | $300 | Implemented |
UC2305 # 05 Y:2023 | 05 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $13,136 | $111,775 | Not Implemented |
UC2305 # 03 Y:2023 | 03 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,923 | $0 | Implemented |
UC2305 # 02 Y:2023 | 02 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,483 | $0 | Implemented |
UC2305 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $6 | $0 | Implemented |
MA0765 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,910 | $95,901 | Not Implemented |
MA0765 # 06 Y:2016 | 06 | 2016 | REDUCE VENTILATION AIR | $1,080 | $900 | Implemented |
MA0765 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $1,576 | $1,152 | Implemented |
MA0765 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,076 | $4,235 | Not Implemented |
MA0765 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,000 | $1,000 | Implemented |
MA0765 # 02 Y:2016 | 02 | 2016 | OPTIMIZE PLANT POWER FACTOR | $15,004 | $12,000 | Implemented |