Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
225
matching recommendationsNAICS | 326199 | All Other Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0591 # 10 Y:2024 | 10 | 2024 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $278 | $454 | n/a |
AS0591 # 09 Y:2024 | 09 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $407 | $324 | n/a |
AS0591 # 08 Y:2024 | 08 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $487 | $1,215 | n/a |
AS0591 # 07 Y:2024 | 07 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $530 | $1,940 | n/a |
AS0591 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $643 | $1,397 | n/a |
AS0591 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,272 | $5,188 | n/a |
AS0591 # 01 Y:2024 | 01 | 2024 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $932,699 | $336,920 | n/a |
AS0591 # 02 Y:2024 | 02 | 2024 | INCREASE USE OF AUTOMATION | $795,203 | $2,763,501 | n/a |
AS0591 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $40,380 | $545,958 | n/a |
AS0591 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,359 | $7,359 | n/a |
WV0671 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,904 | $15,193 | n/a |
WV0671 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,306 | $17,145 | n/a |
WV0671 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,594 | $38,917 | n/a |
WV0671 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $16,714 | $10,679 | n/a |
WV0671 # 14 Y:2024 | 14 | 2024 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $314 | $1,322 | n/a |
WV0671 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $3,901 | $6,364 | n/a |
WV0671 # 09 Y:2024 | 09 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $3,020 | $1,180 | n/a |
WV0671 # 11 Y:2024 | 11 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,525 | $7,504 | n/a |
WV0671 # 06 Y:2024 | 06 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,058 | $5,330 | n/a |
WV0671 # 08 Y:2024 | 08 | 2024 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,623 | $1,200 | n/a |
WV0671 # 12 Y:2024 | 12 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $799 | $1,648 | n/a |
WV0671 # 05 Y:2024 | 05 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,906 | $5,200 | n/a |
WV0671 # 10 Y:2024 | 10 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,918 | $2,094 | n/a |
WV0671 # 13 Y:2024 | 13 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $768 | $176 | n/a |
MU0055 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,002 | $0 | n/a |