IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

90

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0288 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,987 $8,591 n/a
UA0288 # 03 Y:2024 03 2024 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,549 $1,031 n/a
UA0288 # 01 Y:2024 01 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,634 $1,046 n/a
UA0288 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,645 $1,000 n/a
UA0288 # 09 Y:2024 09 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,856 $4,621 n/a
UA0288 # 08 Y:2024 08 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,656 $994 n/a
UA0288 # 07 Y:2024 07 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $290,423 $2,558,734 n/a
UA0288 # 06 Y:2024 06 2024 OPTIMIZE PLANT POWER FACTOR $8,607 $5,049 n/a
UA0288 # 05 Y:2024 05 2024 RECOVER WASTE HEAT FROM EQUIPMENT $16,178 $10,450 n/a
UA0254 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,608 $2,502 Implemented
UA0254 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,108 $47,329 Implemented
UA0254 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,515 $12,000 Not Implemented
UA0253 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,681 $14,236 Implemented
UA0253 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $1,821 $3,299 Not Implemented
UA0253 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,756 $9,801 Implemented
UA0253 # 06 Y:2022 06 2022 INSTALL TIMERS AND/OR THERMOSTATS $497 $510 Not Implemented
UA0253 # 03 Y:2022 03 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $595 $84 Not Implemented
UA0253 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,709 $1,000 Implemented
UA0207 # 03 Y:2019 03 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,940 $40,000 Not Implemented
UA0207 # 04 Y:2019 04 2019 REPAIR AND ELIMINATE STEAM LEAKS $11,264 $1,950 Not Implemented
UA0207 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,748 $100 Not Implemented
UA0207 # 07 Y:2019 07 2019 INSTALL OCCUPANCY SENSORS $5,904 $1,169 Not Implemented
UA0207 # 06 Y:2019 06 2019 USE RADIANT HEATER FOR SPOT HEATING $14,354 $20,922 Not Implemented
UA0207 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,657 $5,249 Implemented
UA0207 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $65 $137 Not Implemented